狠狠色噜噜狠狠狠-狠狠色噜噜-狠狠色噜狠狠狠狠色综合久-狠狠色狠色综合曰曰-狠狠色狠狠色综合网-狠狠色狠狠色综合婷婷tag

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 国产精选午睡沙发系列999| 夜夜超b天天| 国产亚洲精品第一综合麻豆| 国产suv精品一区二区69| 日本japanese丰满多毛| 男女啪啪高清无遮挡免费| 一本大道熟女人妻中文字幕在线| 中文字幕在线播放| 内射老阿姨1区2区3区4区 | 又粗又大撑满了好爽| 亚洲日韩乱码久久久久久| bt种子在线搜索| 久久亚洲精品国产亚洲老地址 | 亚洲精品久久久久久久久久久捆绑 | 在线va无码中文字幕| 97人妻人人做人碰人人爽| 夜夜澡天天碰人人爱av| 99久久99久久精品国产| 国产免费看插插插视频| 午夜色视频在线观看 | 国产成人精品一区二区三区无码| 色综合社区| 欧美丰满熟妇xx猛交| 大陆国产乱人伦| 亚洲热线99精品视频| 国产精品亚洲成在人线| 三级黄色a| 日韩丰满少妇无码内射| 无码av片在线观看免费| www色午夜| 欧美黑人性暴力猛交喷水| 中文字幕av无码一区电影dvd| 涩综合| 精品国产一区二区三区2021| 中文天堂在线资源www| 34pao强力打造免费永久视频| 嫩草伊人久久精品少妇av| 亚洲色欧美在线影院| 新版天堂中文网| 日本中文字幕一区二区有码在线| 18禁美女裸体无遮挡网站|